Sage MAS 90 and 200 ERP Product Update 6 (4.40.0.06) - Bill of Materials

Article Index
Sage MAS 90 and 200 ERP Product Update 6 (4.40.0.06)
Accounts Payable
Accounts Receivable
Bill of Materials
Bank Reconcilliation
Customizer
Inventory
Job Cost
Library Master
MRP
Purchase Order
Payroll
RMA
Sales Order
System Setup
Visual Integrator
WO
All Pages

Bill of Matrials

  1. Production Entry now allows options to be selected if a Bill of Material has options on it and extended quantity is now calculated correctly.
  2. Costed Bill of Materials report no longer shows the components of a bill that has been removed using Engineering Change Control Entry.
  3. Serial number of item being disassembled now prints on the Disassembly Register.
  4. Serial numbers selected on disassembly parent bill no longer disappear when entering multiple entries. In addition, unable to select serial numbers in lookup that show 0 quantity available.
  5. Quantity required on Costed bill of Materials report no longer rounds up for components of phantom bills that have a non integer unit of measure.
  6. Pick Sheet Printing now prints the correct phantom bill revision.
  7. Update Invalid Bill Types utility now corrects bills with options, the Indented Bill of Materials Report no longer displays Invalid Bill for bills that are not invalid.
  8. The Summarized Bill of Materials Report now displays component information for the current revision of a subassembly.
  9. Required quantity now updated with quantity changes on the Component Requirement Report for phantom bills.
  10. Miscellaneous Item description now prints correctly on the B/M picking sheet.
  11. Single Level Bill of Material Report now displays Components for only those Options with Components defined.
  12. The Costed Bill of Materials Report now reports the correct component cost for items that are on a standard bill that is a subassembly of a standard bill, and the subassembly standard bill is not the last entry on the phantom bill.


 

Need Support

Connect to supportCustomer Support Line
770-399-8021

MBA Newsletter Subscriptions

Check the box of the newsletter you
would like to subscribe to below:


Sage MAS 90 and 200 Newsletter
MBA Business Software Training Newsletter



twitterfacebookyoutubefeedlinkedin
You are here: Home Blogs Support Blog Sage MAS 90 and 200 ERP Product Update 6 (4.40.0.06) - Bill of Materials