Sage 100 2018 Product Update 9 (6.00.9.0) - Job Cost
Article Index
Page 4 of 5
Job Cost
- Job Billing for Time & Material jobs with multiple subcontract records on the cost code are no longer marking all subcontract records for the cost code as billed even if the billed flag is unchecked.
- Daily Transaction Register no longer includes the WIP associated with the lines that were not selected for billing.
- Job Billing Register > G/L WIP Recap is no longer relieving the WIP associated with the lines that were not selected for billing.